25-Jul-2014, 12:32
Hi,
My 200 took about 500 hours, imagination or not, and I am still waiting for the 400 slave to bed in.
Since going from 170-200 warm up time is no longer from 15 min (170) to about 1 hour (200).
/Mike
My 200 took about 500 hours, imagination or not, and I am still waiting for the 400 slave to bed in.
Since going from 170-200 warm up time is no longer from 15 min (170) to about 1 hour (200).
/Mike
Ex D400 Now Aavik U-300/Feickert Woodpecker2-Kuzma 4P-Kondo silver-Benz LPS-Teddy Pardo PSU/Naim Unitiserve-Teddy Pardo PSU/SF Guarneri Homage/Whole system decoupled by Ansuz DTC/Cables from Ansuz, DYI and other commercial/Dedicated mains and spur-Lampizator SILK