When I had my 250 upgraded to Pro back in 2016 they used around two weeks if my memory serves me right. Maybe three weeks including shipping.
EDIT: as @Vivialet says above, the CI board required another trip to Paris. I also had to 'remind' them after a couple of weeks. My amp was with me two days after..
EDIT: as @Vivialet says above, the CI board required another trip to Paris. I also had to 'remind' them after a couple of weeks. My amp was with me two days after..
*
Devialetless!
Roon or LMS/brutefirDRC on DietPi_x86_64
piCorePlayer/ISORegen/HeadStreamer/Yamaha HP-1
250 Pro CI, MicroRendu, Mutec MC-3+USB
Devialetless!
Roon or LMS/brutefirDRC on DietPi_x86_64
piCorePlayer/ISORegen/HeadStreamer/Yamaha HP-1
250 Pro CI, MicroRendu, Mutec MC-3+USB

