Hello hydr, here drawn the plan quickly.
You need 3 pcs. Allnet PLC coupler ALL16881PC AC 250/440 V 50 / 60Hz, suitable for signal bridging via RCCBs and electricity meters.
An acquaintance, this combination has often installed abroad in 1 Phasigen plants (coupling of data loggers)!
It is best to have an electrician advise you if he can install it for you (wiring diagram)!
Connection diagrams for electricians, on the last page of the description!
Everything, of course, without any guarantee that it will work for you! Therefore, one could install the PLC once provisionally and see that it is successful!
!!!ATTENTION: These devices may only be installed by a qualified electrician, otherwise there is a risk of fire or electric shock.!!!
You need 3 pcs. Allnet PLC coupler ALL16881PC AC 250/440 V 50 / 60Hz, suitable for signal bridging via RCCBs and electricity meters.
An acquaintance, this combination has often installed abroad in 1 Phasigen plants (coupling of data loggers)!
It is best to have an electrician advise you if he can install it for you (wiring diagram)!
Connection diagrams for electricians, on the last page of the description!
Everything, of course, without any guarantee that it will work for you! Therefore, one could install the PLC once provisionally and see that it is successful!
!!!ATTENTION: These devices may only be installed by a qualified electrician, otherwise there is a risk of fire or electric shock.!!!
Aavik U-280 / Audio Physic Cardeas / Melco N1ZS + D100 / Melco Switch S100 / KECES P8 Dual / Transparent Audio PowerWave X / Cable: Audioquest, Shunyata, Transparent, Ansuz Digitalz A2 Ethernet, USB
Remote: iPad-Pro
Roon Nucleus+(B), Lifetime / Qobuz Studio Sublime
Remote: iPad-Pro
Roon Nucleus+(B), Lifetime / Qobuz Studio Sublime
Germany / Bavaria