18-Sep-2015, 15:50
(18-Sep-2015, 15:20)AlexS Wrote: The main reason is not SQ and not money: it's that I don't want to be locked into a single control point app.
Surely you could have used pretty much any UPnP control points with the Aries? That's quite a range, right?
Guillaume
Industry disclosure: UK distributor for Shunyata Research
220 PRO, totaldac d1 server with additional external power supply, totaldac d1-seven, Echole PSU for Totaldac, Wilson Audio Sasha 2, Shunyata Research cables, Shunyata Hydra Alpha A10 + DPC-6 v3, Various Entreq ground boxes and cables, Entreq Athena level 3 rack, 2 X SOtM sNH-10G with sCLK-EX + 10MHz Master Clock input + sPS-500 PSU, i5 sonicTransporter w/ 1TB SSD
UK